Lab Construction and Development

We provide services for making new science lab construction including concrete shalves, tables and wood furnineshed

Scientific planning scheme

The positioning and planning of the laboratory are the basis of the formal laboratory construction. The laboratory planning scheme includes laboratory building planning and laboratory process planning, which requires a lot of preliminary research work. It is necessary to clarify their own needs and the development of laboratories and to extensively inspect the laboratories that have been built by the contractor.

Layout design

Layout design refers to configuring space according to laboratory needs, optimizing the layout and placement of instruments and equipment, fully considering the flow of people and the direction of items, etc., to ensure subsequent designs such as water, electricity in combination with furniture.
img-01
Selection of constructor

When choosing a constructor, you must strictly inspect its design, R&D, production, and construction capabilities and qualifications, inspect its completed projects and the location of the company on the spot, and select the nearest construction unit.

After the design drawings are completed, third-party agencies and authoritative experts are invited to conduct a detailed review to avoid unreasonable designs and major defects. In the construction project, the other party should be required to have a project manager with practical experience, which is conducive to progress control, resource allocation, communication, and coordination.

img-02
Laboratory water supply and drainage system

The pipes of the laboratory drainage system should be resistant to acid and alkali corrosion and the melting of materials by organic reagents. PPR or other materials should be used.

Due to the complicated sewer pipes in large laboratories, necessary measures should be taken to avoid blockage and leakage of the pipes.

Selection of laboratory furniture

The selection of laboratory furniture mainly involves elements such as countertop material, cabinet structure and material, and color matching.

For example, the pretreatment room should use acid and alkali-resistant ceramic plate countertops, and the instrument room should use physical and chemical board countertops.

The structure of the cabinet is mainly divided into three types: steel-wood, aluminum-wood, and all-steel. The support of the test bench can be divided into C-shaped and back-shaped, which should be determined according to the needs of each unit. The layout, type, and quantity of counters in each room should also be fully considered. Side counters, central counters, high cabinets, and hanging cabinets should be properly matched to avoid inconvenience in future work.

In addition, there are some details that should also be considered, such as the reasonable configuration of computer bits to avoid the inconvenience of future use.